We have been informed this week that the manufactures of the reactors would resolve the last problems of the production the coming week and then the systems will be ready to be handed over for the initial testing of the non-nuclear based technology for 3kW power system.
The forum gets monitored by highly educated people and scientists and anything out of line is kept out.
The Foundation is very happy with their work and again we thank them for their work.
Any point which is not relevant or brings in unwanted links are deleted.
Messaggio orinale: https://old.luogocomune.net/site/newbb/viewtopic.php?forum=54&topic_id=7208&post_id=233685